Reminder: Street Work Begins Tomorrow

Resurfacing of the road between Hwy 27 and Brook Hollow will begin on the 15th and last through the 17th. Please be cautious in this area and be aware Weston Hills Blvd will be down to 1-lane at times. The construction crew will be directing traffic during these periods. PLEASE PAY ATTENTION DURING THESE PERIODS!

The front gates will be left open during the construction. They will be turned back on as soon as possible.

Thank you.